The Ely

Building, Queens

The Ely

23 -10 30 Drive

Year built
2021

Built in 2020, with move-ins commencing in 2021, this is the first resale within the building. The condominium features only 14 residences, making it an intimate and community- driven building. The condominium building also features a virtual video intercom system, three shared outdoor spaces (the terrace off the lobby and two rooftop areas), as well as bike storage, cage storage, and a gym off the lobby. The building has an elevator serving all floors and a private parking lot.

Available now

1 home for sale